Memorandium Regarding Ship Construction
Document 1798Memorandum, discusses the construction and equipping Frigate Chesapeake at Portsmouth, Va.
100%
⇣No human transcription currently available for this document.
This transcription was generated by machine using Anthropic's Claude Code (a mix of sonnet and opus models). It may contain errors or inaccuracies. Please verify against the document image. Learn more about our generative AI methodology.
Memorandums
The Canvas should be sent to Portsmouth, or the most part in least
Blocks, masts, pumps, Tops yards should be engages for good Oakum
should be immediately got Junk to makitt, Clear and Merchantable
the Boards & Plank, should be procured for the sides made of Cedar
and Locths, plained off in the woods and bro't out to seasons, Stuff
for Gun Carriages, must be got out to season Iron Sheets to be procured
and a Large Quantity put into a Smiths hands to draw the Bolts
this winter, and have the work ready in the Spring when the
Ship will go on fast and require the Smith work to be received
in great quantities if not ready may impede the Carpenters
and prevent the Ship being Compleated According to Contract
Cordage Should not be postponed by the first of April to
have the rigging all [undecipherable] and gear done The Water Casks
Castle should be agreed for and all the Copper Store. 1 12 [undecipherable]
intended for the larger Frigates ought to be annexed to this Ship the
riging must be timely furnished all the ground Tier Casks and
every other thing should be forwarded in the tender and all
Contracts should be made in the Winter when people are
unemployed, and will undertake their offers and moderate terms
It ought now to be ascertained what Materials can be furnished
from the public Store by the United States and how far they are
to depend on purchasers. If the Ship is to be delivered or Sent to
Sea in to or 14 Months an is generally understood not a Moment
can be lost in Building, her and procuring Materials if they are
not in public Stores. It takes a long time to [undecipherable] a stand
of Mast in these Country and [undecipherable] into all the details for to be [undecipherable: equally]
moved. I have experienced it in these my [undecipherable] Steps
from first Laying the Keel to their Building It ought [undecipherable: Clearly]
to be understood how the Ship is to be Craft any Equipped, whether
their way express [strikethrough: under a way] [strikethrough: Means] Means to give into an of
she was only designed for the force of the United States, or whether
any thing Should be Contracted quantity of Sails, Anchors
and Cables and non essential things to be delivered in the [undecipherable]
Water Casks and Iron Ballast [undecipherable] of masts and Yards
[undecipherable] be [undecipherable] out and [undecipherable] forwarded to enable the said
[undecipherable] the shipping by as also to [undecipherable] the [undecipherable] and [undecipherable]
[BB004]
Type
Letterbook Copy
Description
Memorandum, discusses the construction and equipping Frigate Chesapeake at Portsmouth, Va.
Date
12/1798
Author
Repository
Collection
Document number
1798129935001
Page start
1
Note
This fragment--first page of an apparently longer memorandum--is in the hand of Josiah Fox.
Notable persons
Josiah Fox
naval constructor
Notable locations
Portsmouth
Virginia
Notable items
equip a ship of war in this country
laying the keel
sails
cables
iron ballast
canvas should be sent to Portsmouth
blocks
masts
Tops yards should be engaged
clean and merchantable boards & plank
births
planned out in winter and laid out to season
stuff for gun carriages must be got
have the work ready in the spring when the ship will go on fast
carpenters
prevent the ship being completed according to contract
have the rigging all fixed in good season
casks
large frigates
public stores
contracts should be provided in the winter when people are unemployed
cordage
balast
frigate Chesapeake