Discussion of Planned Construction of Galleys
Document 1797Discusses building and outfitting of galleys [ships], proposing to build them larger than originally planned for.
No human transcription currently available for this document.
This transcription was generated by machine using Anthropic's Claude Code (a mix of sonnet and opus models). It may contain errors or inaccuracies. Please verify against the document image. Learn more about our generative AI methodology.
Pittsburg 15 Decemr 1797
Sir
I have the honor of yours of the 1st Instant, which should have been sooner answered but [undecipherable] to afford you all the information I could obtain
There are a number of qualified workmen to be had in this country, but it will be necessary you should send a superintendent to direct the construction of the Gallies. The workmen for the shipping & Carpenter part of the business, can be had at from [undecipherable] to fifty five dollars per month The
The plan [undecipherable] to build the Gallies, is at Pittsburg. I [have] obtained a list of such scantling as I have [contracted] for, and the prices — The timbers are not yet engaged on contract, and probably [undecipherable] as there are no persons in this Country who [undecipherable] that kind of business — The mode which I am pursuing is, to hire men by the day, to get out the timbers, I have the [undecipherable: frame?] moulds made, and the workmen will commence in a day or two — I beg leave to suggest to you whether it would not be better to make the Gallies longer than proposed
by the plan sent me — Our rivers are so extremely [undecipherable], as to admit of sails being but seldom used, and they are so rapid, that it will require a great many oars to propel the Galley against the stream. According to the plan transmitted to me, the Galley is to be Forty [undecipherable] feet in length, the place for the Gun, [undecipherable] to with take of Twenty five feet which [undecipherable] feet for the Oarsmen — The question then is, whether this space will be sufficient for oars enough to [undecipherable] the Gallies, against a current running from [undecipherable] to [undecipherable]
miles an hour. I am not sufficient a judge to determine the question, but [undecipherable: submit?] it to your judgement and instructions, with the increasing the size from forty feet to seventy [undecipherable] feet with be an improvement when applied to their use on our rivers. —
I think there is little doubt of the Gallies being in readiness to [undecipherable: pass?] down the river about the middle of [undecipherable] towards the latter end of March [undecipherable].
Encloseed is a list of articles which will be required to be sent from Philadelphia for the constructing and completing the Gallies — Please
Please to order forward the person you may employ to superintend the construction of the Gallies, as early as possible.
I am
Sir [undecipherable] Respect
The Honble Your obt Servt
Hum Servt
[signature]
James McHenry
Secy at War
[Enclosure]
[undecipherable: Necessary?] articles [undecipherable] in constructing & completing Gallies, that cannot be conveniently [undecipherable] at Pittsburg for [undecipherable]
Anchors & Cables
[undecipherable] & block[s] [undecipherable] rigging, [undecipherable]
[undecipherable], lead line [undecipherable]
Nails
[undecipherable] for [undecipherable]
Oakum
Turpentine & Rosin
Paints of Sorts [undecipherable] in Oil
[undecipherable]
[undecipherable] Glazing & Spy Glasses
[undecipherable] [undecipherable]
Colors [undecipherable] Ensign, Jacks & Pendants
[undecipherable] Pump[s] & [undecipherable] Nails
Pittsburgh [undecipherable]
[Enclosure]
Prices of Scantling contracted for
[undecipherable] at Pittsburg /
Such to be [undecipherable] at [undecipherable] Cents per [undecipherable]
2 Inch do. a [undecipherable] Cents
3 Inch do. a 3 Cents
3½ Inch do — 3½ Cents
4 Inch do — 4 Cents —
Pittsburgh 16 Decemr 1797 —
Type
Letter
Description
Discusses building and outfitting of galleys [ships], proposing to build them larger than originally planned for.
Date
12/15/1797
Author
Recipient
Sent from
Pittsburgh
Collection
Document number
1797121540101
Page start
1
Note
3 COLLECTIONS: one with photocopy images, two without images.
Notable persons
James McHenry
John Wilkins Jr.
Notable locations
Pittsburgh
Notable items
galleys
[ships]