Duties of A Superintendent of Construction For A Frigate
Document 1796Letter, describes superintendent's duties in the construction of Frigate.
100%
⇣No human transcription currently available for this document.
This transcription was generated by machine using Anthropic's Claude Code (a mix of sonnet and opus models). It may contain errors or inaccuracies. Please verify against the document image. Learn more about our generative AI methodology.
[126]
[undecipherable: Flenst Sanner] Wm Henry Philadelphia 5th Nov 1796
Secretary of War
Thomas Thompson proposes to superintend the Frigate Building at Portsmouth by Col. James Hackett,
viz. to inspect, assist and over see the Carpenters work, Caulking, Joiners work, Blacksmiths work, and all the Mast work
agreeable to directions from proper Officers of Government, for the sum of $50 Dollars, meaning the Terms of Providing, and after this Consideration suppose 300 Days
signed, Thomas Thompson
Honll James Wm Henry
Secretary of War
Proposals from Thomas Thompson for Superintending, manning, Rigging and Equipping, the Frigate now Building at Portsmouth Complete for Sea
Said Thompson to Superintend the Building and Equipping, in every respect. to provide Mast Houses, the Rigging Lofts, and to [undecipherable] the Rigging at his own cost and Charge to receive all Stores and Materials of every Kind, to purchase them, or to make Contracts for Rigging, Sails, Blocks, Boats, [undecipherable], [undecipherable] and any other Provisions connected with the Ship, and pay their Bills, The United States providing the Money in good [undecipherable], and to pay all Persons [undecipherable] [undecipherable] the rigging in the [undecipherable] said Thompson is to do at his own Cost, and every other thing [undecipherable] untill she is compleat for sea, for the sum of [undecipherable] Dollars, in full Compensation for [undecipherable] to Said Thompson engages that every thing should be done with care and Frugality, agreeable to every [undecipherable] Ship, and at all times agreeable to directions from the United States
signed Thomas Thompson
N B it will take 12 Months, strict attention to Compleat the Ship for sea, to [undecipherable] the [undecipherable] of rigging, every thing to be most Naturally planned, and engaged
Type
Letterbook Copy
Description
Letter, describes superintendent's duties in the construction of Frigate.
Date
11/05/1796
Author
Recipient
Sent from
Philadelphia
Repository
Collection
Document number
1796110540001
Page start
1
Notable persons
James McHenry
Thomas Thompson
Colonel James Hackett
superintendent
carpenters
blacksmith
sailmakers
joiners
tradesmen
Notable locations
Philadelphia
United States
Portsmouth
Notable items
frigate
inspect
oversee
blacksmiths work
framework
ironwork
carpenters work
caulking
mast work
proposals
rigging
equipping
store houses
cost and charge
materials
sials
blocks
boats
bills
pay
labor
compensation
frugality
ship