Letter from the War Office to Captain James Sever
Document 1795Discusses the procedure of using salt water and dry salt to preserve ship timbers. Arrival of copper expected shortly. Discussion on the sending of the wrong sized copper bolts. Sever's pay will be remitted without delay.
No human transcription currently available for this document.
This transcription was generated by machine using Anthropic's Claude Code (a mix of sonnet and opus models). It may contain errors or inaccuracies. Please verify against the document image. Learn more about our generative AI methodology.
[Mr Isaiah Facs]
War Office June 23, 1795.
Sir,
I have received your letter of the 9th, and handed it to Mr Humphreys for his information, and remarks. His opinion on the laying of the keel of the frigates building at Portsmouth Virginia, is expressed in the inclosed copy of his letter of the 22, to which you will substantially conform.
Navy Yard June 22, 1795.
Sir
I have to observe on Mr Fac's letter to you, dated Naval yard, Portsmouth, June 9, 1795, that neither time nor expence should be spared in laying the heels of the frigates in the best possible position for launching. I think from his description of the ground, it will be very proper to lower the keel a foot; in fact, to keep it as low as possible on the blocks, all fore and aft, as will barely admit of putting on the false keel. If they have sufficient water for launching, I would give the keel the same declivity as the launching ways. If the water is scant, it should be left as described in a former letter to you on that subject.
(signed) Joshua Humphreys.
The Secretary at War.
[Capt. Ja.s Sever]
War Office May 14, 1795.
Sir
I have received your letter of the 26th. Your direction for putting the white oak timber, when dressed, into salt water, is doubtless a very good one. By this post will be transmitted to Mr Hacket copies of two letters from Mr Humphreys, the Constructor of the frigate building at Philadelphia. In one of them he suggests that it may be expedient to bore the ends of the timbers and for a certain part to run a whip saw through the center, and then to fill the auger holes, and the opening with salt, in order to prevent the rotting of the timber. Should Mr Hacket approve the project of boring, and soaking [strikethrough: the putting them into salt water will more effectually preserve them], I conceive, than Mr Humphreys's application of salt. The part sawed, may be opened, as Mr Humphreys proposed, and if the time they shall lay in the salt water shall raise a doubt whether they are sufficiently penetrated, the dry salt may be afterwards applied.
I understand that the copper arrived at New York, is merely for the frigate building at that place; a similar arrival has happened at Philadelphia. The copper for all the other frigates may now be expected daily at the respective ports, or at ports convenient to those where the frigates are building. Unfortunately a mistake in copying the directions for the bolts at the Office of the Commissioner of the Revenue, last year, has occasioned the sending out the largest bolts of [undecipherable] inches diameter, instead of 1β
[undecipherable]. Experiments have been made to reduce them. It is under conβ
Type
Letterbook
Description
Discusses the procedure of using salt water and dry salt to preserve ship timbers. Arrival of copper expected shortly. Discussion on the sending of the wrong sized copper bolts. Sever's pay will be remitted without delay.
Date
05/14/1795
Recipient
Sent from
Philadelphia
Document number
1795051415355
Page start
113
Notable persons
Captain James Sever
James Hackett
Timothy Pickering
Superintendent
Naval constructor
Joshua Humphreys
Mr Sheaff
Sheaffe
Notable locations
War Department
Philadelphia
New York
Portsmouth New Hampshire
Notable items
white oak timber
salt water
frigate
beams
copper
dry salt
auger
auger holes
pay
USS Congress